Concrete driveway building
When your driveway has sunk or holds water by the garage, we dig out and pack the base and pour a new one that sheds water toward the street.
Good Form Riverview Concrete Company pours concrete driveways, patios, walks, pool decks and steps in Apollo Beach, FL, and builds footings, slabs and foundations for builders, with the base dug out and packed before any concrete goes down.

In Apollo Beach, Good Form Riverview Concrete Company builds and replaces driveways, patios, walks, pool decks and steps for homeowners, and pours footings, slabs and foundations for builders and property owners. We're a concrete contractor based in Riverview, FL, and I come out to look over each job myself.
Most calls we get from Apollo Beach start with something you can see from the driveway, a corner that's sunk, cracks running across the middle or water sitting by the garage door after a storm. Those usually trace back to the ground under the slab, so that's where I start looking, before we talk about color or finish.
A lot of our work here is pool decks, back patios and walks out toward the water, along with driveways that carry a truck and a boat trailer. Each of those calls for a different thickness and finish, so we start from how you'll use the slab, not from a standard size. We do the same kind of work in Ruskin.
When your driveway has sunk or holds water by the garage, we dig out and pack the base and pour a new one that sheds water toward the street.
A back patio on a waterfront lot gets sun and rain all year, so we pitch it away from the house and cut joints where cracks should go.
Stamped concrete gives a patio or entry the look of stone or tile in one solid slab, and it still needs the same packed base underneath.
If a walk to the front door or the dock has heaved or tilts so water sits on it, we replace it with straight edges and a steady pitch.
A garage that holds a truck, tools and a workbench needs a floor that's thick enough and flat, so we set the base and grade before the pour.
Decorative concrete means color, exposed stone or a border, for a front entry that should stand out, and it sits on the same careful prep as a plain slab.
Where a yard steps down toward the water or a neighbor's lot, a concrete retaining wall holds the soil back, and its footing decides whether it stays plumb.
For a new room, shop or shed, we pour an interior concrete floor that's level for whatever goes on top, with the ground packed firm under it first.
A pool deck takes bare feet, splashed water and summer sun, so we slope it to drains and give it a texture that's less slick when wet.
When front or back steps have pulled away from the house or rock underfoot, we rebuild them on a proper footing with even rises from bottom to top.
Builders and owners adding a home, garage or addition call us for slab foundations, where the forms, the steel and the packed fill have to be right first.
For a new structure, we lay out and pour the foundation, and we check the lines more than once because every wall built later follows them.
Shops, offices and waterfront businesses with daily traffic need a parking lot that drains and carries weight, so the base gets even more of our attention.
Footings are the concrete under a wall, column or addition, and we dig and pour them to the plans so what sits on top has firm ground.
If a slab or foundation has dropped and doors stick or floors slope, we look at why it moved before we talk about raising it.
Concrete cutting helps when you need a clean opening for a drain line, a door or a new walk tying into an old slab without extra breakage.
Send the form and we'll reply within one business day to set a time. I come out to your Apollo Beach property myself to look over the job and measure, and the estimate is free, written out so you can see what's included, and comes with no obligation.
(813) 471-5890Hillsborough County is the local government for Apollo Beach, and the county's Building Services issues construction permits for most construction here. Its list of work that typically needs no permit covers things like paint, tile and fencing, not concrete, so we check each job. When a permit is needed, the county's review sets the start date, and after that the schedule turns on the weather and how long the slab has to cure.
You can check two things about any contractor before you hire. The county Tax Collector requires a business to hold a local business tax receipt before it operates, with a physical location in Hillsborough County, not a PO box. A state-certified contractor had to pass a state certification exam to get that license, so ask which license they hold and ask to see it.
I check whether your address falls under the county or a city so we know which office issues the permit, and when your job needs one, we pull it and handle the paperwork. Price moves with the size and thickness of the slab, the old concrete coming out, the base work and the finish, and your written estimate shows what's included. We do the same work in East Lake-Orient Park and Gibsonton.
I learned this trade as a helper, hauling, setting forms and pulling screed long before I ran a job, and I started this business in Riverview in 2013. I still come out myself to look over your job and measure, and our own crew does the work with me running it, so the person who looked at your base is there when it gets packed.
When a budget gets tight, the base is the first thing people want to cut, because nobody sees it on pour day. I'd cut the finish first. A plain broom finish, the light texture dragged across the top for grip, still looks clean, while a slab on a poorly packed base usually settles with the dirt under it.
I'd rather tell you what I don't know yet than guess, so if something under the old slab can only be seen once it's up, I'll say so at the estimate. We're fully licensed and insured. Your satisfaction, guaranteed. To set up a visit, call (813) 471-5890 or fill out our estimate form.
Apollo Beach's weather and its waterfront lots change how we plan a pour. Here's what we watch for on jobs here and what it means for your slab.
Summers here are hot and humid, and concrete poured in the midday sun can set on top before it's finished, which leaves a weak, dusty surface that chips later. In the hot months we try to start early in the morning so we have time to place, finish and cut joints before the heat builds. If a forecast looks wrong for a pour, I'd rather move the date.
Many lots here back onto the canals that lead out to Tampa Bay, and the yard usually falls toward the water. That helps a patio drain if we pitch it the right way, and it works against you if the old slab was set flat or tipped toward the house. We check where the water runs before we set a single form, because that decides the pitch.
The subgrade, the soil your slab sits on, has to be dug out to firm ground and packed, not just raked level. Near the water and after a wet summer, soft spots turn up, and a slab poured over one sinks with the dirt. I won't know everything until the old concrete is up, so I'll tell you then what we found and what it changes.
Every slab shrinks as it dries, so some cracking is normal. Control joints are the straight lines we cut into the slab so it cracks along them instead of across the middle. We cut them the same day as the pour, because joints cut late or skipped leave cracks wherever the slab chooses, and rebar, the steel inside the slab, helps hold any crack tight.
The cost of a new driveway comes down to its size, how thick it needs to be for what you park on it, whether the old one has to be broken up and hauled off, and how much the ground needs before we pour. Heavier loads can call for a thicker slab and rebar. After I measure, you get a written estimate showing what's included.
It can qualify for an exemption in narrow cases, and even then you have to apply for it. Non-structural work on a single-family home valued under $7,500 can be exempt once the owner or contractor files an exemption application with the contract showing scope and value. Structural work, jobs of $7,500 or more and property partly or entirely in a flood hazard area don't qualify, so we check before assuming either way.
Yes, generally, if the house is your primary residence and it's in your name. Florida lets homeowners act as their own contractor, which takes an Owner Builder Disclosure Statement, and the house can't be sold for one year from when the work was completed. The county explains pulling your own permit on its site. If you hire us, we pull it when the job needs one.
Stop the work right away. The county's next step is for you to email permitting@hcfl.gov about an After-The-Fact permit, and work that keeps going can bring a citation of up to $500 per violation. If a slab was half-done when you called us, we'll look at what's there and tell you what we can see and what we'd have to open up to check.
You'll be able to walk on it well before you can drive on it, because concrete keeps gaining strength long after it looks hard. That wait is called curing, and putting a car on it too soon is how edges chip and slabs crack early. Plan on parking on the street for a while, and I'll tell you at the estimate when yours is ready for each.
Move cars, boats and trailers off the work area and leave a clear path for the truck to reach it. Tell us where sprinkler lines, landscape lights and any buried lines run, because they're easy to break when we dig out the base. Keep pets and kids inside on pour day, since wet concrete takes a footprint for good.
We're open seven days a week from 6 AM to 11 PM, so you can call (813) 471-5890 after work or on a weekend, or send the contact form whenever it suits you.